2
1
Your location:
Homepage
/
/
/
China's offshore platform localization rate has reached 60%

News

Check category

News Details

China's offshore platform localization rate has reached 60%

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2018-03-13 14:57
  • Views:

(Summary description)Sina Finance News The "2016 CCTV Finance Forum and China Listed Companies Summit" hosted by China Central Television was held in Beijing on December 11-12, 2016. Wang Jianzhong, President of CIMC Raffles Offshore Engineering Co., Ltd., attended and delivered a speech. When it comes to offshore platforms, it said that it has been nearly a decade for Chinese companies to really get involved in deepwater drilling. The localization rate was less than 10% before, but it has reached 60%. The construction period has been shortened from 50 months to 30 months, covering the world. Major oil producing areas, including the Norwegian North Sea, where the sea conditions are the worst, have made great progress and have gained industrial confidence in the field.

China's offshore platform localization rate has reached 60%

(Summary description)Sina Finance News The "2016 CCTV Finance Forum and China Listed Companies Summit" hosted by China Central Television was held in Beijing on December 11-12, 2016. Wang Jianzhong, President of CIMC Raffles Offshore Engineering Co., Ltd., attended and delivered a speech. When it comes to offshore platforms, it said that it has been nearly a decade for Chinese companies to really get involved in deepwater drilling. The localization rate was less than 10% before, but it has reached 60%. The construction period has been shortened from 50 months to 30 months, covering the world. Major oil producing areas, including the Norwegian North Sea, where the sea conditions are the worst, have made great progress and have gained industrial confidence in the field.

  • Categories:Industry News
  • Author:
  • Origin:
  • Time of issue:2018-03-13 14:57
  • Views:
Information
Sina Finance News The "2016 CCTV Finance Forum and China Listed Companies Summit" hosted by China Central Television was held in Beijing on December 11-12, 2016. Wang Jianzhong, President of CIMC Raffles Offshore Engineering Co., Ltd., attended and delivered a speech. When it comes to offshore platforms, it said that it has been nearly a decade for Chinese companies to really get involved in deepwater drilling. The localization rate was less than 10% before, but it has reached 60%. The construction period has been shortened from 50 months to 30 months, covering the world. Major oil producing areas, including the Norwegian North Sea, where the sea conditions are the worst, have made great progress and have gained industrial confidence in the field.